Our kitchen fitter experiencing none of the previous day’s travel dramas arrived on time. Shortly afterwards the tiler arrived.
Later in the morning I drove to Attingham Park for my usual Tuesday volunteering at Visitor Reception. The day was lovely and warm compared to the previous Tuesday afternoon and also the flooding had subsided. This led [...]

No Comments CherryPie on Jan 15th 2025

Monday
Today was intended to be a later start which in the end turned out to be even later due to two road traffic accidents blocking the route. Now the larder units are in place around the fridge freezer with one of them fully fitted with draws.
Whilst all this was going on I was wresting with [...]

4 Comments CherryPie on Jan 13th 2025

Friday
I awoke to a beautiful sunny frosty morning. Not long after our kitchen fitter arrived followed by his son who is working on the electrical parts of our kitchen refit.
First the electrician investigated the reason for the kitchen ceiling light failure. After investigation it was deemed that ceiling light was faulty and corroded which had [...]

2 Comments CherryPie on Jan 11th 2025

Thursday
The kitchen is now begining to look more like a kitchen again. We called in briefly to see mum after the fitter had left, she had been in bed all day and although she was pleased to see us she told us to leave.
We dined in the Vineyard Cantonese Restaurant for the first time since [...]

2 Comments CherryPie on Jan 9th 2025

Wednesday
Our kitchen fitter had a personal commitment in the morning which meant we could return to our normal routine rather than getting up earlier than usual.
Our fitter arrived at lunchtime, complete with a substitute light to work by due to our currently non-working ceiling light. He worked through into the early evening which meant I [...]

No Comments CherryPie on Jan 9th 2025

Tuesday
The kitchen units arrived and were stacked around the house, both inside and out. Shortly afterwards the plumber arrived and worked miracles with the piping under the sink. It now looks much neater than it has ever done before.
Next the wall and floor units were installed ready for the finer tuning. During the afternoon whilst [...]

No Comments CherryPie on Jan 8th 2025

Monday
We had to be up early, although not necessarily bright for and 8pm start.
The kitchen was completely stripped leaving only the electrical appliances, including the cooker which is not part of the new design.
The two-week work schedule and options were discussed. The spaghetti plumbing underneath the sink will be tidied up, the plug sockets will [...]

4 Comments CherryPie on Jan 7th 2025